Personal communications satellite blueprint

A clickable readiness map from a personal message-satellite idea to the first qualified trial path. It shows what is ready, what is blocked, and which evidence must exist before a launch or altitude test can even be discussed.

已評審: 2026-06-14評審到期: 2026-09-14active

預設邊界: This blueprint is a public-safe readiness map. It is not legal advice, RF guidance, station setup, launch instruction, rocket manufacturing guidance, range procedure, integration instruction, site approval, mission authorization, or flight-readiness claim.

Completion rule: All steps being marked ready means only that a qualified trial path can be reviewed. It does not mean launch, RF transmission, altitude test, safety, legality, funding, site use, or mission success is approved.

North Star / BP review

Aligned if implemented as evidence gatework; conflicting if implemented as a self-developed launch or hardware manufacturing program.

Raw launch-test language can overstate authority, safety, and readiness.

Constraint: Use 'first qualified trial path' until authority, integration, disposal, and evidence gates are closed by qualified review.

Merge adjustment

verified message or audited no-go

Treat the personal journey as evidence storytelling: blueprint -> readiness gates -> private qualified review -> hosted or partner-first trial path -> verified LEO message or precise no-go.

Source pack: docs/personal_satellite_blueprint_source_pack_20260614.md

Current decision

First go/no-go

Go for public-safe blueprint, source indexing, simulation learning, receive-only evidence practice, and non-flight evidence discipline. No-go for self-developed orbital launch, public RF parameters, motor or propellant work, named site planning, launch booking, hardware flight-readiness claims, or sponsor claims that outrun evidence.

Total steps11Blueprint steps
Success0ready
Paper go5paper-go
Blocked / private6blocked
已評審2026-06-18Next action

Blueprint steps

Readiness gates

01 · paper-go; private evidence openScope, story, and mission ledgerReduce the journey to a message-only personal mission with a visible no-go list, private ledger, sponsor boundary, and public-claims rule.

Readiness level: 2

02 · candidate-only; no transmission or launch commitmentAuthority and qualified review mapMap communications authority, payload review, remote-sensing applicability, airspace, and launch operator boundaries before any test is treated as real.

Readiness level: 1

03 · receive-only and bench learning go; transmit blockedCheap-to-formal communicator ladderStart with cheap evidence practice and move toward formal communication hardware only when authority, integration, and evidence gates support it.

Readiness level: 2

04 · go for learning; no adoptionSimulation and open-project learningUse simulation and open projects to learn documentation, tests, interfaces, and failure posture before buying or building flight hardware.

Readiness level: 2

05 · documentation go; flight hardware blockedNon-flight prototype and materials evidenceBuild only non-flight evidence: requirements, interface assumptions, material provenance, assembly records, inspection records, and environmental-test questions.

Readiness level: 1

06 · source-learning only; launch blockedBalloon altitude-test pathUse ballooning as a regulated altitude-test category for payload evidence and storytelling, not as a shortcut to spaceflight.

Readiness level: 1

07 · club / certified path only; no motor workModel and high-power rocketry learning pathStudy rocketry only through certified motors, club ranges, safety codes, simulation, insurance, site permission, and FAA / local gates.

Readiness level: 1

08 · hosted-first; named outreach private-blockedHosted payload and launch integration pathTest whether the verified-message objective can be reduced to a hosted payload or partner payload before full spacecraft ownership.

Readiness level: 1

09 · evidence skeleton onlyProduction and test evidence packetTurn production into a bill of evidence: requirements, versioned artifacts, materials/process review, inspection, environmental testing, anomaly log, and public redaction status.

Readiness level: 1

10 · narrative allowed; investor claims blockedFunding, sponsor, and video recordRecord the journey as evidence, blockers, learning, and no-go discipline without implying launch readiness or investment certainty.

Readiness level: 2

11 · blocked until all prior gates closeFirst qualified trial decisionDecide whether a first qualified trial path exists: receive-only practice, balloon test, supervised club test, hosted payload, partner payload, or precise no-go.

Readiness level: 0

Step details

藍圖

01 · Scope, story, and mission ledger

Reduce the journey to a message-only personal mission with a visible no-go list, private ledger, sponsor boundary, and public-claims rule.

paper-go; private evidence openReadiness level: 2

Current preparation

  • North Star and operating protocol exist.
  • Blank private ledger template exists.
  • Public claims matrix and no-go template exist.

Missing evidence

  • Owner-filled private mission ledger.
  • One-paragraph mission-specific success statement.
  • Sponsor / video narrative boundary reviewed against public claims.

Next safe action: Fill the private ledger outside committed git and attach the blueprint as the public map.

停止條件: Stop if the mission becomes a commercial communications service, launch service, remote-sensing service, hardware guide, or authorization shortcut.

Nodes

來源

02 · Authority and qualified review map

Map communications authority, payload review, remote-sensing applicability, airspace, and launch operator boundaries before any test is treated as real.

candidate-only; no transmission or launch commitmentReadiness level: 1

Current preparation

  • Authority source matrix exists.
  • FCC, FAA, NOAA / CRSRA, IARU, and eCFR source pointers are registered.
  • FCC current-access caveat is recorded.

Missing evidence

  • Mission-specific authority memo.
  • Qualified counsel / agency or experienced reviewer route.
  • Private record of which paths are ruled out.

Next safe action: Convert the source matrix into a private authority memo before any RF, launch, or outreach commitment.

停止條件: Stop before transmission planning, launch commitment, or success claim if no credible authority path exists.

Nodes

來源

03 · Cheap-to-formal communicator ladder

Start with cheap evidence practice and move toward formal communication hardware only when authority, integration, and evidence gates support it.

receive-only and bench learning go; transmit blockedReadiness level: 2

Current preparation

  • Receive-only evidence packet template exists.
  • NASA SmallSat communications and open receive-network sources are indexed.
  • SatNOGS / TinyGS are treated as receive-learning examples only.

Missing evidence

  • Private non-radiating bench test log.
  • Authority review before any RF transmission.
  • Integrator-provided or qualified-reviewed formal communicator path.

Next safe action: Use simulator, wired loopback, stored-data replay, and receive-only observation logs before any transmitter is discussed.

停止條件: Stop if the next step requires publishing frequencies, power, antennas, modulation, commands, uplink, or station setup.

Nodes

來源

04 · Simulation and open-project learning

Use simulation and open projects to learn documentation, tests, interfaces, and failure posture before buying or building flight hardware.

go for learning; no adoptionReadiness level: 2

Current preparation

  • External project lessons extraction exists for F Prime, cFS, NOS3, and OpenC3.
  • OpenRocket is indexed as a model-rocketry simulation learning tool.
  • Open-source CubeSat projects are indexed as documentation examples.

Missing evidence

  • No technology adoption scorecard for any upstream tool.
  • No mission-specific simulation validation record.
  • No qualified review of any software or hardware stack.

Next safe action: Create a private tabletop / simulation log that records assumptions, outputs, and why it is not readiness evidence.

停止條件: Stop if a simulator, GitHub repo, or example project is treated as proof of safety, legality, or flight readiness.

Nodes

來源

05 · Non-flight prototype and materials evidence

Build only non-flight evidence: requirements, interface assumptions, material provenance, assembly records, inspection records, and environmental-test questions.

documentation go; flight hardware blockedReadiness level: 1

Current preparation

  • NASA CSLI and CubeSat.org standards / test indices are available.
  • PROVES, OreSat, and PyCubed provide open-source caution and documentation examples.
  • Payload-minimum memo skeleton exists.

Missing evidence

  • Mission-specific requirements document.
  • Non-flight prototype bill of evidence.
  • Materials and process review by a qualified reviewer or integrator.
  • Environmental verification plan.

Next safe action: Define a non-flight prototype evidence packet without publishing schematics, RF details, or flight integration assumptions.

停止條件: Stop if educational or cheap hardware is treated as spaceflight-ready, or if material choices become a manufacturing recipe.

Nodes

來源

06 · Balloon altitude-test path

Use ballooning as a regulated altitude-test category for payload evidence and storytelling, not as a shortcut to spaceflight.

source-learning only; launch blockedReadiness level: 1

Current preparation

  • 14 CFR Part 101 Subpart D and NASA balloon lifecycle documents are indexed.
  • Balloon path is separated from orbital mission readiness.
  • No launch location or operational plan is recorded.

Missing evidence

  • Local legal / airspace review.
  • Landowner or site permission.
  • Payload, marking, termination, tracking, recovery, weather, insurance, and hazard records.
  • Private launch-day go/no-go checklist.

Next safe action: Create a private balloon-readiness memo with source pointers and stop rules, not a launch procedure.

停止條件: Stop if tracking, recovery, airspace, hazardous payload, land permission, or local law is unresolved.

Nodes

來源

07 · Model and high-power rocketry learning path

Study rocketry only through certified motors, club ranges, safety codes, simulation, insurance, site permission, and FAA / local gates.

club / certified path only; no motor workReadiness level: 1

Current preparation

  • NAR, Tripoli, eCFR Part 101, and OpenRocket sources are indexed.
  • Model rocketry and high-power rocketry are separated from orbital launch.
  • No launch operation, motor, or range procedure is recorded.

Missing evidence

  • Local club / certification route.
  • Site owner permission and insurance evidence.
  • FAA / local airspace and fire authority review, if applicable.
  • Safe payload and recovery boundary review.

Next safe action: Treat rocketry as an external supervised learning path; use OpenRocket only for simulation literacy and club discussion.

停止條件: Stop if the path requires motor making, propellant work, ignition detail, launch procedure, private range operation, or payload hazards.

Nodes

來源

08 · Hosted payload and launch integration path

Test whether the verified-message objective can be reduced to a hosted payload or partner payload before full spacecraft ownership.

hosted-first; named outreach private-blockedReadiness level: 1

Current preparation

  • Hosted-payload-first gate exists.
  • NASA CSLI, SpaceX rideshare, D-Orbit hosted payload, and CubeSat.org standards sources are indexed.
  • No provider, quote, schedule, or integration commitment is public.

Missing evidence

  • Private category shortlist.
  • Integrator / provider screening questions.
  • Responsibility split for authority, testing, operations, disposal, and evidence.
  • Qualified review of any named option.

Next safe action: Prepare private hosted-payload screening notes using category questions only.

停止條件: Stop if full spacecraft ownership, launch booking, or provider commitment is assumed before hosted / partner paths are reviewed.

Nodes

來源

09 · Production and test evidence packet

Turn production into a bill of evidence: requirements, versioned artifacts, materials/process review, inspection, environmental testing, anomaly log, and public redaction status.

evidence skeleton onlyReadiness level: 1

Current preparation

  • Receive-only evidence template exists.
  • Gate evidence map exists.
  • NASA and CubeSat.org source indices point to standards, testing, and materials/process references.

Missing evidence

  • Prototype configuration record.
  • Materials / process compliance review.
  • Environmental and functional test reports.
  • Anomaly and waiver log.
  • Public redaction review.

Next safe action: Draft a blank production evidence packet that lists fields without publishing build instructions.

停止條件: Stop if a bill of materials, supplier list, or assembly note becomes a public flight-hardware recipe.

Nodes

來源

10 · Funding, sponsor, and video record

Record the journey as evidence, blockers, learning, and no-go discipline without implying launch readiness or investment certainty.

narrative allowed; investor claims blockedReadiness level: 2

Current preparation

  • BP v0.1 says CosmosExplore can become a gatework / evidence venture, not a rocket maker.
  • Public claims matrix exists.
  • This blueprint can become a sponsor-safe progress surface after review.

Missing evidence

  • Sponsor boundary note.
  • Investor / sponsor deck claims review.
  • Private budget and responsibility memo.
  • Qualified reviewer feedback before any fundraising claim is strengthened.

Next safe action: Create a public-safe video / sponsor claims checklist that says what can be shown and what stays private.

停止條件: Stop if sponsor copy claims authorization, safety, launch date, test readiness, or orbital success before evidence exists.

Nodes

來源

11 · First qualified trial decision

Decide whether a first qualified trial path exists: receive-only practice, balloon test, supervised club test, hosted payload, partner payload, or precise no-go.

blocked until all prior gates closeReadiness level: 0

Current preparation

  • Public blueprint exists after this batch.
  • Review #1 public packet and gate evidence map exist.
  • No trial path is approved.

Missing evidence

  • Private ledger complete enough for review.
  • Authority memo and qualified review.
  • Site / partner / integrator / disposal / evidence responsibilities closed.
  • Public claims review before any announcement.

Next safe action: After private evidence is filled, run a gate review that can choose one of: continue, balloon-only, supervised rocketry-only, hosted-payload review, partner review, or no-go.

停止條件: Stop and record no-go if any earlier gate remains unresolved or if the only available path depends on unsafe or unauthorized shortcuts.

Nodes

來源

Allowed next actions

Go

  • Use the blueprint to update the private mission ledger.
  • Run receive-only and non-radiating evidence practice.
  • Study balloon, rocketry, and hosted-payload paths as separate regulated categories.
  • Collect sponsor-facing evidence only after public-claims review.

Blocked actions

No-go

  • No public RF configuration, frequency, power, antenna, modulation, command, or uplink detail.
  • No propellant, motor, ignition, launch, recovery, or range operation instructions.
  • No named private site, sponsor, reviewer, provider quote, or partner term in public git.
  • No claim that a cheap communicator, open-source kit, balloon, or club rocket path proves orbital readiness.

來源

來源