Gate evidence map
North Star gate evidence map
A public-safe map from the verified-message North Star gates to evidence categories, current artifacts, missing private work, and stop conditions.
確認日: 2026-06-11次回確認期限: 2026-09-10started
既定の境界: This map defines evidence categories and stop conditions. It is not legal advice, RF guidance, station setup, launch booking, integration instruction, or mission authorization.
Use rules
Gate evidence map
- Treat every gate as open until evidence is attached.
- A gate can be marked go only after qualified review or source-backed evidence supports it.
- A precise no-go record is a valid successful outcome when a hard blocker appears.
- Public claims must stay weaker than the evidence packet.
Current decision
verified message or audited no-go
One compliant, authenticated, logged, verifiable message from LEO, with authority, integration, disposal, and post-mission records attached.
Readiness gates
Gate evidence map
| Gate | Purpose | Go evidence | Current public artifacts | Missing private evidence | 停止条件 | Public/private boundary | Nodes |
|---|---|---|---|---|---|---|---|
| gate-01-scope Scope and not-goal gate | Keep the mission personal, non-commercial, message-only, and evidence-first before any authority or hardware path is interpreted. |
|
|
| Stop and rewrite the scope before continuing if the mission becomes a commercial service, public connectivity product, remote-sensing service, launch service, hardware guide, or legal shortcut. | Public git can contain scope categories and blank checklists. Private git must contain any personal intent details, private reviewer notes, or outreach context. | |
| gate-02-authority Authority and qualified-review gate | Separate candidate communications, payload-review, remote-sensing, and stop-transmission questions before any commitment is treated as real. |
FCC Space StationsFCC Small Satellite and Small Spacecraft Licensing ProcessFCC Part 5 Experimental Licensing47 CFR § 25.122 Applications for streamlined small space station authorization47 CFR § 25.114 Applications for space station authorizations47 CFR § 97.207 Space station47 CFR § 97.3 DefinitionsIARU Amateur Radio Satellite Frequency CoordinationFAA Payload ReviewsNOAA Commercial Remote Sensing Regulatory Affairs: Licensing15 CFR Part 960 Licensing of Private Remote Sensing Space Systems |
|
| Stop before transmission planning, launch commitment, or success claims if no credible authority path is identified or if the mission scope mismatches the candidate path. | Public content may summarize source-backed categories. Private records must hold reviewer names, correspondence, legal analysis, and mission-specific conclusions. | |
| gate-03-hosted-payload-first Hosted-payload-first gate | Force the mission to test the smallest hosted or partner payload path before accepting full spacecraft ownership responsibility. |
|
|
| Stop if the plan assumes full spacecraft ownership before the hosted-payload or partner path has been documented and ruled in or out. | Public git can contain category filters and generic integration questions. Private storage must hold names, private terms, correspondence, or partner-specific feasibility. | |
| gate-04-funding-responsibility Funding, role, and responsibility gate | Prevent launch price or payload cost from being mistaken for total mission responsibility. |
|
|
| Stop before integration or launch commitment if responsibility is implicit, unfunded, or treated as only a launch-price problem. | Public content can describe cost categories and responsibility gates. Private storage must hold personal budget, named owners, legal spend, quotes, or commercial terms. | |
| gate-05-disposal Disposal and debris-mitigation gate | Tie orbit and mission duration to debris mitigation, disposal, stored-energy, and post-mission evidence before orbit is treated as chosen. |
|
|
| Stop if orbit is selected for contact convenience while disposal, debris mitigation, stored energy, or post-mission records remain unresolved. | Public git can contain disposal questions and source-backed gates. Private storage must hold mission-specific orbit, integrator, safety, and closeout records. | |
| gate-06-evidence-claims Evidence and public-claims gate | Ensure a received message is preserved as evidence without overstating authorization, safety, or commercial readiness. |
|
|
| Stop public success claims if the evidence packet lacks authority context, integration context, disposal context, provenance, or data-integrity notes. | Public git can contain blank templates and redacted lessons. Private storage must hold raw observation artifacts, personal logs, private timestamps, or unredacted mission records. |
Allowed next actions
Go
- Use this map to guide private ledger updates.
- Use this map to identify the next missing evidence category before any outreach or commitment.
- Link public knowledge nodes to gates only when they clarify evidence, blockers, or stop conditions.
Blocked actions
No-go
- Do not mark any gate closed from public source reading alone.
- Do not publish named reviewer or partner records.
- Do not publish RF, station, command, launch, or integration operational details.
- Do not claim that a received message proves authorization, safety, or commercial readiness.
出典
出典
NASA CubeSat 101: Basic Concepts and Processes for First-Time CubeSat DevelopersNASA SmallSat Institute: Ground Data Systems and Mission OperationsNASA SmallSat Institute: Identification and Tracking SystemsNASA SmallSat Institute: Integration, Launch, and DeploymentFCC Space StationsFCC Small Satellite and Small Spacecraft Licensing ProcessFCC Part 5 Experimental Licensing47 CFR § 25.122 Applications for streamlined small space station authorization47 CFR § 25.114 Applications for space station authorizations47 CFR § 97.207 Space station47 CFR § 97.3 DefinitionsIARU Amateur Radio Satellite Frequency CoordinationFAA Payload Reviews14 CFR § 450.43 Payload review and determinationNOAA Commercial Remote Sensing Regulatory Affairs: Licensing15 CFR Part 960 Licensing of Private Remote Sensing Space SystemsNASA Orbital Debris Program Office: Debris MitigationU.S. Government Orbital Debris Mitigation Standard Practices, November 2019 UpdateCelesTrak NORAD Documentation: Two-Line Element SetsSpaceX Smallsat Rideshare Program